Home Tom and Lori - Building the Bristol Plumbing and Final Framing

Plumbing and Final Framing

The plumbers have arrived to begin work.
Here is the plumbing for the laundry room.
Plumbing and heating ducts in the basement.
Plumbing for the master bath.
Water heaters have been installed in the basement.
Plumbing for the shower in the master bath.
The final framing updates have been made and here is the butler's pantry between the kitchen and dining room.
The kitchen island.
A nice framing touch for the entryway.
Final framing in the basement.
Another view in the basement.  The layout does a good job of working with the structural supports and beams and working them into the framing.
The two-sided fireplace a seen from the office on the main level.
The master bedroom and fireplace.
 

Free Design Consultation

Click here to get started on the home of your dreams!