![]() |
The heating ducts and hvac equipment is set inside the framing. |
![]() |
A view of the attic heating system. |
![]() |
The windows have arrived and will be set soon. |
![]() |
One final look at the house before the windows and doors are placed. Some work has started on the roof. |




