Driveway Pavement

Here the workers pour the concrete for the driveway.
The concrete is smoothed by hand.
Texture is added to the driveway.
Here a worker puts the finishing touches on the walkway to the front door.
 

Deck is Under Construction

Work has started on our deck off the kitchen nook.  The deck is 17 feet long and will have great views.
Here is another view of the deck under construction in the morning.
This is the view of the back deck from the kitchen nook.
 

Retaining Walls

Retaining walls were added to each side of the house.  These will merge with our landscaping that is to come from Front Range Landscapes.
Here is the second retaining wall.  We used a consistent brick, as opposed to rock.
 

Tile Complete in Master Bath

Here is the ccompleted master bath shower tile.  We developed a unique design with a few smaller colored tile pieces and a diamond shape as a center piece for the shower.  It is very classy looking and adds a great look to the tile work.  This is another advantage to the semi-custom home.
Here is the tile for the shower floor, very intricate work here.
These soap holders are a nice touch and will come in handy in the shower.
A close-up of the tile work and the diamond in the master shower.
The tub is on order and will arrive soon.
Here is the master closet and a nice feature is the fresh cedar wood added to the floor.  It smells great!
The closets are done, here is the upstairs hallway closet
 